CGN Qinghai Lenghu Wind Power Generation Co., Ltd., a subsidiary of CGN group, is mainly engaged in the investment, development, construction and management of wind power projects and the sales of wind power products and equipment. CGN Cold Lake wind farm in Qinghai is the first wind farm built by CGN new energy in Qinghai. It is located in the hinterland of Qinghai Tibet Plateau and belongs to plateau Gobi landform, about 1300 kilometers away from Xining, the capital of Qinghai Province. The 2022 government work report proposes to implement the action plan for reaching the peak of carbon and promote the transformation from "dual control" of energy consumption to "dual control" of total carbon emission and intensity. CGN Qinghai Lenghu Wind Power Generation Co., Ltd. actively responded to the call of the government to provide environmental protection, energy conservation and emission reduction for the northwest, ensure energy security, optimize energy structure, and finally achieve coordinated and sustainable economic and social development.
Minimalist, green, intelligent and safe are the major requirements of CGN Qinghai Lenghu Wind Power Co., Ltd. for the data room. After many in-depth communication with users, considering the special importance of the industry of the computer room, Avida IDC team recommended a data center solution that meets the needs of the project, and finally adopted the latest generation dimension series X3 micro module data center, which covers UPS system, power supply and distribution system, cold channel closed system, refrigeration system, intelligent monitoring system, etc., so as to achieve rapid delivery, reliable and safe power supply, The purpose of intelligent management is to focus on the whole life cycle management of the data center and escort the energy conservation and emission reduction of CGN and renewable energy.
The official launch of the data center of CGN Qinghai Lenghu Wind Power Generation Co., Ltd. can better enable the data to escort the development, construction and management of green power. In the future, Avida will also continue to optimize the green management capability of the data center and help the green development of the data center industry and the realization of the dual carbon goal.
Tags :